Ford Sierra



Ford Sierra
1.2. Car identification
2. Maintenance service
- 3. The general data
    3.1. Cars with petrol engines
   - 3.2. Cars with diesel engines
      - 3.2.1. Changes in a design of the car with 1988 to 1993
         3.2.1.1. The engine 2,3 дм3
          3.2.1.2. The engine 1,8 дм3
         - 3.2.1.3. Fuel system
            3.2.1.3.1. The fuel filter
            3.2.1.3.2. Removal and installation of atomizers
            3.2.1.3.3. The fuel pump
          3.2.1.4. The repair which is not demanding removal of the engine
         3.2.1.5. Removal and engine installation
         3.2.1.6. Engine dismantling
         3.2.1.7. Check of details
         3.2.1.8. Check of backlashes of a cranked shaft and rods
         3.2.1.9. Engine assemblage
         3.2.1.10. Greasing system
         3.2.1.11. Cooling system
         3.2.1.12. Coupling
         3.2.1.13. A mechanical five-speed transmission of type МТ 75
         3.2.1.14. A power shaft and the back bridge
         3.2.1.15. Steering system
         3.2.1.16. A forward suspension bracket
         3.2.1.17. Brake system
         3.2.1.18. The electric equipment
         3.2.1.19. The general data
4. Engines
5. Coupling
6. Transmissions
7. A kardannyj shaft and the back bridge
8. A steering
9. Suspension brackets
10. Brake system
11. A body
12. An electric equipment


Customize your viewing experience and create personalized playlists on 123Movies.

3.2.1.3.2. Removal and installation of atomizers
THE GENERAL DATA

The prevention

It is necessary to protect the generator from hit in it of diesel fuel.


Removal

PERFORMANCE ORDER
1. To disconnect from the accumulator a weight wire.
2. Cautiously to disconnect from the fuel pump of connection of pipelines of injection.
3. Cautiously to disconnect from atomizers of connection of pipelines of injection.
4. To disconnect from atomizers pipelines of return of fuel.
5. To unscrew atomizers and to establish on sprays protective caps.
6. To take washers of thermal isolation and to wipe them.

Installation

PERFORMANCE ORDER
1. To establish new washers of thermal isolation by the convex party to a head of the block of cylinders.
2. To insert atomizers into apertures in a head of the block of cylinders and to tighten their necessary moment.
3. To screw on atomizers of connection of pipelines of injection. To be convinced that скобы fastenings of pipelines (counteracting fluctuations) are on demanded places.
4. To screw connections of pipelines of injection on the fuel pump.
5. To establish on atomizers pipelines of return of fuel.
6. To connect the accumulator, to start the engine and to check up tightness of connections.