Ford Sierra



Ford Sierra
1.2. Car identification
2. Maintenance service
3. The general data
- 4. Engines
   - 4.1. Petrol engines
       4.1.1. Technical characteristics
      4.1.2. Adjustment of backlashes of valves
       4.1.3. Ignition system
       4.1.4. Fuel system
       4.1.5. The repair which is not demanding removal of the engine
      4.1.6. Removal and engine installation
      4.1.7. Engine dismantling
      4.1.8. Identification of co-operating parts
      4.1.9. Engine assemblage
      4.1.10. Replacement of pistons
      4.1.11. Removal and installation of an intermediate shaft
      4.1.12. System timing
      4.1.13. Greasing system
      - 4.1.14. Cooling system
         4.1.14.1. Plums of a liquid and filling of system of cooling
         4.1.14.2. Removal and radiator installation
         4.1.14.3. Removal and fan installation
         4.1.14.4. The pump охладжающей liquids
         4.1.14.5. Thermostat replacement
      4.1.15. A suspension bracket of the power unit
      4.1.16. System of release of the fulfilled gases
    4.2. The diesel engine
5. Coupling
6. Transmissions
7. A kardannyj shaft and the back bridge
8. A steering
9. Suspension brackets
10. Brake system
11. A body
12. An electric equipment



4.1.14.4. The pump of a cooling liquid
THE GENERAL DATA

Bolts of fastening of the pump


Removal

PERFORMANCE ORDER
1. To disconnect from the accumulator a wire of weight and to merge a liquid from cooling system.
2. To remove a radiator and the fan.
3. To disconnect from the pump of a cooling liquid the elastic pipeline conducting to a heater.
4. To remove a casing of a gear belt.
5. To remove the elastic pipeline of a cooling liquid between the pump cooling жтдкости and a radiator.
6. To unscrew 3 bolts of fastening of the pump of a cooling liquid and completely to take the pump.

Repair

PERFORMANCE ORDER
1. To remove by means of a press a pulley of a drive of the pump.
2. To take from the case of the pump knot of a shaft of the pump with consolidation, the precision bearing and a rotor.
3. To remove a sealant from a shaft of the pump and to take the precision bearing from the pump case.
4. By means of a ring and a shaft of the corresponding diameter and length to move a nave of a pulley of the pump on a pump shaft so that the shaft end acted on 1,5 mm over an external surface of a nave.
5. To establish a new sealant on a shaft of the pump and in deepening in the case.
6. To establish on a pump shaft its rotor so that a backlash between its blades and the pump case made 0,8 mm.

Installation

PERFORMANCE ORDER
1. To clear surfaces of connection of the case of the pump and the block of cylinders of the engine.
2. To establish the pump together with a new lining on the block of cylinders.
3. To establish a casing of a gear belt.
4. To connect to the pump of a cooling liquid the elastic pipelines connecting the pump with a radiator and a heater.
5. To establish a radiator and the fan.
6. To adjust a tension клинового a belt (1 – a bolt of the tension device, And – a belt deflection (And = 10 mm)).
7. To fill cooling system, to connect the accumulator and to check up tightness and functioning of system of cooling. In case of need to add level of a cooling liquid.