Ford Sierra



Ford Sierra
1.2. Car identification
2. Maintenance service
3. The general data
4. Engines
5. Coupling
6. Transmissions
7. A kardannyj shaft and the back bridge
- 8. A steering
   8.1. Technical characteristics
   8.2. Removal and installation of steering transfer
   8.3. Dismantling and assemblage of steering transfer
   8.4. Removal and installation of a steering column
   8.5. Dismantling and steering wheel assemblage
    8.6. A steering with the hydraulic booster
9. Suspension brackets
10. Brake system
11. A body
12. An electric equipment



8.3. Dismantling and assemblage of steering transfer

Dismantling

PERFORMANCE ORDER
1. To disconnect tips with spherical hinges from steering draughts after easing of fastening of counternuts.
2. To remove collars of fastening of casings and to remove protective a casing of the case of steering transfer.
3. To move gear рейку to the left against the stop and to clamp in a vice with soft cheeks.
4. A corresponding key to unscrew steering draughts from gear рейки.
5. To uncover a pusher a cover of steering transfer, to take a lining, adjusting linings, a spring and a pusher.
6. To uncover приводной gear wheels of steering transfer together with its lining.
7. To remove the bearing from a shaft приводной gear wheels of steering transfer.
8. To take gear рейку from the transfer case.
9. To take a nylon directing ring on the right side of the case of steering transfer.

Assemblage

PERFORMANCE ORDER
1. To clear and check up a technical condition of all details; to replace the worn out or damaged details.
2. To insert into the case a nylon directing ring on the right side of the case of steering transfer.
3. To attach gear рейку to the case of steering transfer and to establish рейку on the average position.
4. To establish приводную a gear wheel in the case of steering transfer together with the bearing.
5. To insert a lining and a case cover приводной gear wheels.
6. To establish a pusher in the case of steering transfer.
7. To establish the indicator of hour type together with скобой (15.046 and 13.008).
8. To establish on разметочной to a plate a gauge arrow on a zero.
9. To establish the gauge on a pusher, and its measuring tip to rest against the case of steering transfer.
10. To write down the indication () during moving gear рейки from one extreme position to another.
11. A thickness () linings which should be established under a pusher cover, are defined in millimetres on the basis of expression:
Е = AND j F
Where:
And – the indication of the gauge of display type;
j = 0,14 mm – a thickness of a lining;
F = 0,015... 0,150 mm – a constructive backlash.
12. To establish a pusher spring, adjusting linings of the calculated thickness, a lining, a cover and to tighten bolts of fastening of a cover.
13. By means of a dynamometer to check up the moment of resistance during turn приводной gear wheels of steering transfer (subsection 7.1 see).
14. To move gear рейку in the case against the stop to the left and to clamp in a vice with soft cheeks.
15. To connect steering bent for gear рейке and to put on protective a casing of the case of transfer.
16. To establish new collars of fastening of casings.
17. To connect to steering draughts tips with spherical hinges and to fix them from unscrewing.